{"id":6642,"date":"2026-06-02T07:40:59","date_gmt":"2026-06-02T00:40:59","guid":{"rendered":"https:\/\/datkhucongnghiep247.com.vn\/en\/?p=6642"},"modified":"2026-06-02T07:40:59","modified_gmt":"2026-06-02T00:40:59","slug":"hoa-hoi-industrial-park","status":"publish","type":"post","link":"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/","title":{"rendered":"Hoa Hoi Industrial Park Regains Momentum, Opening New Investment Opportunities in Gia Lai 2026"},"content":{"rendered":"<h2 data-section-id=\"6k3tei\" data-start=\"93\" data-end=\"145\"><span class=\"ez-toc-section\" id=\"Hoa_Hoi_Industrial_Park_Enters_a_New_Growth_Phase\"><\/span>Hoa Hoi Industrial Park Enters a New Growth Phase<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"147\" data-end=\"519\">After years of delays caused by infrastructure investment challenges and land clearance issues, Hoa Hoi Industrial Park (Hoa Hoi IP) in Hoa Hoi Commune, Gia Lai Province, is showing clear signs of revival. Phase 1 infrastructure is now largely completed, several secondary investors have begun building factories, and preparations for Phase 2 development are accelerating.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-6643\" src=\"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-content\/uploads\/2026\/06\/d277760c-f374-4a7c-8ccb-8279a65f66c4.png\" alt=\"Industrial-Park.webp\" width=\"1536\" height=\"1024\" srcset=\"https:\/\/industrialland.com.vn\/en\/wp-content\/uploads\/2026\/06\/d277760c-f374-4a7c-8ccb-8279a65f66c4.png 1536w, https:\/\/industrialland.com.vn\/en\/wp-content\/uploads\/2026\/06\/d277760c-f374-4a7c-8ccb-8279a65f66c4-768x512.png 768w, https:\/\/industrialland.com.vn\/en\/wp-content\/uploads\/2026\/06\/d277760c-f374-4a7c-8ccb-8279a65f66c4-510x340.png 510w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_81 ez-toc-wrap-center counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">M\u1ee4C L\u1ee4C<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><ul class='ez-toc-list-level-2' ><li class='ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Hoa_Hoi_Industrial_Park_Enters_a_New_Growth_Phase\" >Hoa Hoi Industrial Park Enters a New Growth Phase<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Phase_1_Infrastructure_Nears_Completion\" >Phase 1 Infrastructure Nears Completion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Water_Supply_System_to_Be_Completed_in_June_2026\" >Water Supply System to Be Completed in June 2026<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Positive_Progress_in_Investment_Attraction\" >Positive Progress in Investment Attraction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Preparing_for_Phase_2_Expansion_of_More_Than_88_Hectares\" >Preparing for Phase 2 Expansion of More Than 88 Hectares<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Accelerating_Land_Clearance_Efforts\" >Accelerating Land Clearance Efforts<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Gia_Lai_Benefits_from_Industrial_Relocation_Trends\" >Gia Lai Benefits from Industrial Relocation Trends<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Abundant_Land_Availability\" >Abundant Land Availability<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Competitive_Investment_Costs\" >Competitive Investment Costs<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Improving_Transportation_Connectivity\" >Improving Transportation Connectivity<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Young_and_Available_Workforce\" >Young and Available Workforce<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Industrial_Real_Estate_Potential_in_Gia_Lai\" >Industrial Real Estate Potential in Gia Lai<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Conclusion\" >Conclusion<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/industrialland.com.vn\/en\/hoa-hoi-industrial-park\/#Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" >Free access to exclusive information on warehouse, factory, and land rentals in Dong Nai, Binh Duong, Long An, Ho Chi Minh City, and more.<\/a><\/li><\/ul><\/nav><\/div>\n\n<p data-start=\"521\" data-end=\"674\">These positive developments are expected to transform Hoa Hoi Industrial Park into a new industrial growth driver for Vietnam\u2019s Central Highlands region.<\/p>\n<hr data-start=\"676\" data-end=\"679\" \/>\n<h2 data-section-id=\"1lmktkj\" data-start=\"681\" data-end=\"723\"><span class=\"ez-toc-section\" id=\"Phase_1_Infrastructure_Nears_Completion\"><\/span>Phase 1 Infrastructure Nears Completion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"725\" data-end=\"903\">Compared to many industrial parks across Vietnam, Hoa Hoi Industrial Park is not particularly large in scale. However, its implementation progress was previously considered slow.<\/p>\n<p data-start=\"905\" data-end=\"1092\">For many years, the Phase 1 area, covering approximately <strong data-start=\"962\" data-end=\"980\">176.8 hectares<\/strong>, remained largely unfinished, with overgrown land and limited infrastructure, causing concerns among investors.<\/p>\n<p data-start=\"1094\" data-end=\"1150\">Today, the park presents a completely different picture.<\/p>\n<p data-start=\"1152\" data-end=\"1278\">The entire Phase 1 area has been leveled and divided into functional zones connected by a comprehensive internal road network.<\/p>\n<p data-start=\"1280\" data-end=\"1343\">Major infrastructure components have been completed, including:<\/p>\n<ul data-start=\"1345\" data-end=\"1542\">\n<li data-section-id=\"aaa76c\" data-start=\"1345\" data-end=\"1377\">Internal transportation roads.<\/li>\n<li data-section-id=\"uuiasv\" data-start=\"1378\" data-end=\"1404\">Street lighting systems.<\/li>\n<li data-section-id=\"1qv49yh\" data-start=\"1405\" data-end=\"1448\">Fire prevention and firefighting systems.<\/li>\n<li data-section-id=\"1u9ey6q\" data-start=\"1449\" data-end=\"1475\">Drainage infrastructure.<\/li>\n<li data-section-id=\"1xlvjif\" data-start=\"1476\" data-end=\"1507\">Landscaping and green spaces.<\/li>\n<li data-section-id=\"jjqzcj\" data-start=\"1508\" data-end=\"1542\">Industrial power supply network.<\/li>\n<\/ul>\n<p data-start=\"1544\" data-end=\"1761\">Most notably, the centralized wastewater treatment plant for Phase 1, with a capacity of <strong data-start=\"1633\" data-end=\"1663\">1,200 cubic meters per day<\/strong>, has been completed and put into operation, ensuring environmental compliance for future tenants.<\/p>\n<hr data-start=\"1763\" data-end=\"1766\" \/>\n<h2 data-section-id=\"121e8y\" data-start=\"1768\" data-end=\"1819\"><span class=\"ez-toc-section\" id=\"Water_Supply_System_to_Be_Completed_in_June_2026\"><\/span>Water Supply System to Be Completed in June 2026<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"1821\" data-end=\"1974\">According to the project schedule, the clean water distribution pipeline throughout Hoa Hoi Industrial Park is expected to be completed by mid-June 2026.<\/p>\n<p data-start=\"1976\" data-end=\"2044\">Once operational, the system will provide a stable water supply for:<\/p>\n<ul data-start=\"2046\" data-end=\"2167\">\n<li data-section-id=\"uaqyi1\" data-start=\"2046\" data-end=\"2081\">Industrial production activities.<\/li>\n<li data-section-id=\"ub12ku\" data-start=\"2082\" data-end=\"2106\">Employee living needs.<\/li>\n<li data-section-id=\"1mt8pbc\" data-start=\"2107\" data-end=\"2167\">Supporting commercial services within the industrial park.<\/li>\n<\/ul>\n<p data-start=\"2169\" data-end=\"2262\">This marks an important milestone in improving the park\u2019s readiness to welcome new investors.<\/p>\n<hr data-start=\"2264\" data-end=\"2267\" \/>\n<h2 data-section-id=\"1c353qw\" data-start=\"2269\" data-end=\"2314\"><span class=\"ez-toc-section\" id=\"Positive_Progress_in_Investment_Attraction\"><\/span>Positive Progress in Investment Attraction<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"2316\" data-end=\"2422\">Alongside infrastructure development, investment promotion efforts have also produced encouraging results.<\/p>\n<p data-start=\"2424\" data-end=\"2434\">Currently:<\/p>\n<ul data-start=\"2436\" data-end=\"2736\">\n<li data-section-id=\"vaj7q4\" data-start=\"2436\" data-end=\"2545\"><strong data-start=\"2438\" data-end=\"2475\">Four foreign-invested enterprises<\/strong> are constructing manufacturing facilities within the industrial park.<\/li>\n<li data-section-id=\"pns1u7\" data-start=\"2546\" data-end=\"2638\"><strong data-start=\"2548\" data-end=\"2578\">Three additional companies<\/strong> have signed preliminary agreements to develop new projects.<\/li>\n<li data-section-id=\"1hsprjq\" data-start=\"2639\" data-end=\"2736\">The total registered investment value of these new projects is estimated at <strong data-start=\"2717\" data-end=\"2735\">USD 42 million<\/strong>.<\/li>\n<\/ul>\n<p data-start=\"2738\" data-end=\"2917\">The growing presence of international investors demonstrates increasing confidence in Gia Lai\u2019s industrial development potential and Hoa Hoi Industrial Park\u2019s long-term prospects.<\/p>\n<hr data-start=\"2919\" data-end=\"2922\" \/>\n<h2 data-section-id=\"tkqmmm\" data-start=\"2924\" data-end=\"2983\"><span class=\"ez-toc-section\" id=\"Preparing_for_Phase_2_Expansion_of_More_Than_88_Hectares\"><\/span>Preparing for Phase 2 Expansion of More Than 88 Hectares<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"2985\" data-end=\"3133\">While completing Phase 1 infrastructure, the developer is actively coordinating with local authorities to prepare for the implementation of Phase 2.<\/p>\n<p data-start=\"3135\" data-end=\"3268\">The expansion phase will cover more than <strong data-start=\"3176\" data-end=\"3191\">88 hectares<\/strong>, creating additional industrial land to accommodate growing investor demand.<\/p>\n<p data-start=\"3270\" data-end=\"3299\">Current preparations include:<\/p>\n<ul data-start=\"3301\" data-end=\"3485\">\n<li data-section-id=\"bx58ef\" data-start=\"3301\" data-end=\"3323\">Cadastral surveying.<\/li>\n<li data-section-id=\"65ud7n\" data-start=\"3324\" data-end=\"3361\">Technical documentation completion.<\/li>\n<li data-section-id=\"36vs8y\" data-start=\"3362\" data-end=\"3393\">Land-use status verification.<\/li>\n<li data-section-id=\"skl81r\" data-start=\"3394\" data-end=\"3437\">Compensation and site clearance planning.<\/li>\n<li data-section-id=\"wrkvss\" data-start=\"3438\" data-end=\"3485\">Budget preparation for compensation payments.<\/li>\n<\/ul>\n<p data-start=\"3487\" data-end=\"3575\">The expansion is expected to provide significant room for future industrial development.<\/p>\n<hr data-start=\"3577\" data-end=\"3580\" \/>\n<h2 data-section-id=\"ltwzon\" data-start=\"3582\" data-end=\"3620\"><span class=\"ez-toc-section\" id=\"Accelerating_Land_Clearance_Efforts\"><\/span>Accelerating Land Clearance Efforts<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"3622\" data-end=\"3733\">According to preliminary assessments, approximately <strong data-start=\"3674\" data-end=\"3692\">154 households<\/strong> will be affected by Phase 2 development.<\/p>\n<p data-start=\"3735\" data-end=\"3746\">Among them:<\/p>\n<ul data-start=\"3748\" data-end=\"3816\">\n<li data-section-id=\"w5z35j\" data-start=\"3748\" data-end=\"3816\">Around <strong data-start=\"3757\" data-end=\"3774\">20 households<\/strong> will require relocation and resettlement.<\/li>\n<\/ul>\n<p data-start=\"3818\" data-end=\"3849\">Local authorities have already:<\/p>\n<ul data-start=\"3851\" data-end=\"4042\">\n<li data-section-id=\"jjokv6\" data-start=\"3851\" data-end=\"3889\">Established dedicated support teams.<\/li>\n<li data-section-id=\"xm78ix\" data-start=\"3890\" data-end=\"3931\">Conducted public consultation meetings.<\/li>\n<li data-section-id=\"1xv2bsh\" data-start=\"3932\" data-end=\"3974\">Publicized project planning information.<\/li>\n<li data-section-id=\"11rnj7s\" data-start=\"3975\" data-end=\"4006\">Surveyed affected land areas.<\/li>\n<li data-section-id=\"uu8bm2\" data-start=\"4007\" data-end=\"4042\">Prepared resettlement land plots.<\/li>\n<\/ul>\n<p data-start=\"4044\" data-end=\"4139\">These efforts aim to ensure transparency, community support, and smooth project implementation.<\/p>\n<hr data-start=\"4141\" data-end=\"4144\" \/>\n<h2 data-section-id=\"ha90x7\" data-start=\"4146\" data-end=\"4199\"><span class=\"ez-toc-section\" id=\"Gia_Lai_Benefits_from_Industrial_Relocation_Trends\"><\/span>Gia Lai Benefits from Industrial Relocation Trends<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"4201\" data-end=\"4427\">As industrial parks in Vietnam\u2019s southern economic region become increasingly occupied and land costs continue to rise, provinces with larger land reserves such as Gia Lai are emerging as attractive alternatives for investors.<\/p>\n<p data-start=\"4429\" data-end=\"4479\">Hoa Hoi Industrial Park offers several advantages:<\/p>\n<h3 data-section-id=\"1p8m193\" data-start=\"4481\" data-end=\"4511\"><span class=\"ez-toc-section\" id=\"Abundant_Land_Availability\"><\/span>Abundant Land Availability<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"4513\" data-end=\"4621\">The project provides long-term expansion opportunities and accommodates large-scale industrial developments.<\/p>\n<h3 data-section-id=\"hsk1bs\" data-start=\"4623\" data-end=\"4655\"><span class=\"ez-toc-section\" id=\"Competitive_Investment_Costs\"><\/span>Competitive Investment Costs<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"4657\" data-end=\"4751\">Land lease rates and labor costs remain lower than many industrial parks in Southeast Vietnam.<\/p>\n<h3 data-section-id=\"x4ucma\" data-start=\"4753\" data-end=\"4794\"><span class=\"ez-toc-section\" id=\"Improving_Transportation_Connectivity\"><\/span>Improving Transportation Connectivity<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"4796\" data-end=\"4925\">Major infrastructure investments throughout the Central Highlands are enhancing connections to seaports and key economic centers.<\/p>\n<h3 data-section-id=\"x2hpgi\" data-start=\"4927\" data-end=\"4960\"><span class=\"ez-toc-section\" id=\"Young_and_Available_Workforce\"><\/span>Young and Available Workforce<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"4962\" data-end=\"5064\">Gia Lai possesses a growing labor force capable of supporting manufacturing and industrial activities.<\/p>\n<hr data-start=\"5066\" data-end=\"5069\" \/>\n<h2 data-section-id=\"14ueit2\" data-start=\"5071\" data-end=\"5117\"><span class=\"ez-toc-section\" id=\"Industrial_Real_Estate_Potential_in_Gia_Lai\"><\/span>Industrial Real Estate Potential in Gia Lai<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"5119\" data-end=\"5281\">The revival of Hoa Hoi Industrial Park creates opportunities not only for industrial production but also for the broader industrial real estate sector in Gia Lai.<\/p>\n<p data-start=\"5283\" data-end=\"5318\">Demand is expected to increase for:<\/p>\n<ul data-start=\"5320\" data-end=\"5417\">\n<li data-section-id=\"9dfi9g\" data-start=\"5320\" data-end=\"5344\">Ready-built factories.<\/li>\n<li data-section-id=\"1tgzi5f\" data-start=\"5345\" data-end=\"5368\">Logistics warehouses.<\/li>\n<li data-section-id=\"1kp5pjl\" data-start=\"5369\" data-end=\"5386\">Worker housing.<\/li>\n<li data-section-id=\"1hisihs\" data-start=\"5387\" data-end=\"5417\">Industrial support services.<\/li>\n<\/ul>\n<p data-start=\"5419\" data-end=\"5587\">As more factories become operational, Gia Lai has the opportunity to develop a complete industrial ecosystem that generates employment and boosts local economic growth.<\/p>\n<hr data-start=\"5589\" data-end=\"5592\" \/>\n<h2 data-section-id=\"8dtpi\" data-start=\"5594\" data-end=\"5607\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"5609\" data-end=\"5910\">After years of stagnation, Hoa Hoi Industrial Park is demonstrating strong signs of recovery. With Phase 1 infrastructure largely completed, new investment commitments totaling USD 42 million, and an upcoming Phase 2 expansion of more than 88 hectares, the project is entering a promising new chapter.<\/p>\n<p data-start=\"5912\" data-end=\"6216\">As industrial investment increasingly shifts toward provinces with abundant land resources and competitive costs, Hoa Hoi Industrial Park is well positioned to become one of Gia Lai\u2019s key industrial development hubs and a major investment destination in Vietnam\u2019s Central Highlands over the coming years.<\/p>\n<p data-start=\"5726\" data-end=\"5748\"><strong data-start=\"5726\" data-end=\"5746\">References:<\/strong><\/p>\n<ul data-start=\"5749\" data-end=\"5903\">\n<li data-section-id=\"qg9xo1\" data-start=\"5749\" data-end=\"5815\">\n<p data-start=\"5751\" data-end=\"5815\"><a class=\"decorated-link\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_new\" rel=\"noopener\" data-start=\"5751\" data-end=\"5813\">Dat Khu C\u00f4ng Nghi\u1ec7p 247<\/a><\/p>\n<\/li>\n<\/ul>\n<h1><span class=\"ez-toc-section\" id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><strong>Free access to exclusive information on warehouse, factory, and land rentals in Dong Nai, Binh Duong, Long An, Ho Chi Minh City, and more.<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p><a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_blank\" rel=\"noopener\"><strong>KHU C\u00d4NG NGHI\u1ec6P 247\u00a0<\/strong><\/a>is a company operating in the field of buying, selling, and leasing factories and real estate<strong>.<\/strong>.\u00a0<a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_blank\" rel=\"noopener\">We<\/a>\u00a0are proud to be a leading provider of real estate services in Vietnam. We have a team of highly qualified and experienced real estate consultants who always place trust and credibility at the core of everything we do<a href=\"https:\/\/jsc-vietnam.com\/khu-che-xuat-la-gi-vai-tro-va-loi-ich\/\" target=\"_blank\" rel=\"noopener\">.<\/a><\/p>\n<p><strong>Phone:<\/strong>\u00a0<strong>0901 490 348<\/strong><\/p>\n<p><strong>Email:\u00a0<\/strong>datkhucongnghiep247@gmail.com<\/p>\n<p><strong>Website:\u00a0<\/strong><a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_blank\" rel=\"noopener\">datkhucongnghiep247.com.vn<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hoa Hoi Industrial Park Enters a New Growth Phase After years of delays caused by infrastructure investment challenges and land clearance issues, Hoa Hoi Industrial Park (Hoa Hoi IP) in Hoa Hoi Commune, Gia Lai Province, is showing clear signs of revival. Phase 1 infrastructure is now largely completed, several secondary investors have begun building [&#8230;]\n","protected":false},"author":12,"featured_media":6643,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_focus_keyword":"Industrial Park","rank_math_title":"","rank_math_description":""},"categories":[1],"tags":[],"class_list":["post-6642","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"_links":{"self":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts\/6642","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/comments?post=6642"}],"version-history":[{"count":1,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts\/6642\/revisions"}],"predecessor-version":[{"id":6644,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts\/6642\/revisions\/6644"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/media\/6643"}],"wp:attachment":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/media?parent=6642"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/categories?post=6642"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/tags?post=6642"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}