{"id":6530,"date":"2026-05-26T17:03:01","date_gmt":"2026-05-26T10:03:01","guid":{"rendered":"https:\/\/datkhucongnghiep247.com.vn\/en\/?p=6530"},"modified":"2026-05-26T17:03:01","modified_gmt":"2026-05-26T10:03:01","slug":"industrial-park-welcomes-new-wave","status":"publish","type":"post","link":"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/","title":{"rendered":"Long Hau invests nearly 3.2 trillion VND to expand by an additional 90 hectares: Strategic industrial park welcomes new wave of investment from 2028."},"content":{"rendered":"<p data-start=\"130\" data-end=\"478\"><strong data-start=\"130\" data-end=\"478\">Long Hau Industrial Park is accelerating its expansion with a nearly VND 3.2 trillion project in Can Giuoc, Long An. With an additional 90 hectares of industrial land, the development is expected to become a prime destination for manufacturing, logistics, and technology investors during Vietnam\u2019s next industrial growth cycle from 2028 onward.<img loading=\"lazy\" decoding=\"async\" class=\" wp-image-6531 aligncenter\" src=\"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-content\/uploads\/2026\/05\/1a4121a8-594a-486b-9149-e40af2432cfa.png\" alt=\"industrial-park.webp\" width=\"608\" height=\"405\" srcset=\"https:\/\/industrialland.com.vn\/en\/wp-content\/uploads\/2026\/05\/1a4121a8-594a-486b-9149-e40af2432cfa.png 1536w, https:\/\/industrialland.com.vn\/en\/wp-content\/uploads\/2026\/05\/1a4121a8-594a-486b-9149-e40af2432cfa-768x512.png 768w, https:\/\/industrialland.com.vn\/en\/wp-content\/uploads\/2026\/05\/1a4121a8-594a-486b-9149-e40af2432cfa-510x340.png 510w\" sizes=\"auto, (max-width: 608px) 100vw, 608px\" \/><\/strong><\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_81 ez-toc-wrap-center counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">M\u1ee4C L\u1ee4C<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><ul class='ez-toc-list-level-2' ><li class='ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Long_Hau_Accelerates_Industrial_Land_Expansion_in_Long_An\" >Long Hau Accelerates Industrial Land Expansion in Long An<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#What_Does_the_Nearly_VND_32_Trillion_Project_Include\" >What Does the Nearly VND 3.2 Trillion Project Include?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Why_Is_Long_Haus_Expansion_Drawing_Market_Attention\" >Why Is Long Hau\u2019s Expansion Drawing Market Attention?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#1_Strategic_Location_Near_Ho_Chi_Minh_City\" >1. Strategic Location Near Ho Chi Minh City<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#2_Long_Hau_Has_a_Proven_Operating_Track_Record\" >2. Long Hau Has a Proven Operating Track Record<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#3_Industrial_Land_Near_Ho_Chi_Minh_City_Is_Becoming_Scarce\" >3. Industrial Land Near Ho Chi Minh City Is Becoming Scarce<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#4_Global_Supply_Chain_Shifts_Continue_Supporting_Demand\" >4. Global Supply Chain Shifts Continue Supporting Demand<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Current_Land_Conditions_and_Development_Challenges\" >Current Land Conditions and Development Challenges<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Advantages\" >Advantages<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Challenges\" >Challenges<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Long_Haus_Financial_Position\" >Long Hau\u2019s Financial Position<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Which_Investors_Could_Be_Interested\" >Which Investors Could Be Interested?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Logistics_Operators\" >Logistics Operators<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Export_Manufacturers\" >Export Manufacturers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Supporting_Industries\" >Supporting Industries<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Ready-Built_Factory_Users\" >Ready-Built Factory Users<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Cold_Chain_and_Food_Supply_Logistics\" >Cold Chain and Food Supply Logistics<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Market_Impact_on_Vietnams_Industrial_Real_Estate_Sector\" >Market Impact on Vietnam\u2019s Industrial Real Estate Sector<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#New_Industrial_Supply_Growth\" >New Industrial Supply Growth<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Increased_Competition_in_Long_An\" >Increased Competition in Long An<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#FDI_Support\" >FDI Support<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Reinforcement_of_Industrial_Decentralization\" >Reinforcement of Industrial Decentralization<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Conclusion\" >Conclusion<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/industrialland.com.vn\/en\/industrial-park-welcomes-new-wave\/#Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" >Free access to exclusive information on warehouse, factory, and land rentals in Dong Nai, Binh Duong, Long An, Ho Chi Minh City, and more.<\/a><\/li><\/ul><\/nav><\/div>\n\n<h2 data-section-id=\"xa4mic\" data-start=\"480\" data-end=\"540\"><span class=\"ez-toc-section\" id=\"Long_Hau_Accelerates_Industrial_Land_Expansion_in_Long_An\"><\/span>Long Hau Accelerates Industrial Land Expansion in Long An<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"542\" data-end=\"812\">As Vietnam\u2019s industrial real estate market enters a new growth phase, <strong data-start=\"612\" data-end=\"654\">Long Hau Corporation (stock code: LHG)<\/strong> is strengthening its market position through the expansion of <strong data-start=\"717\" data-end=\"753\">Long Hau Industrial Park Phase 2<\/strong>, with a total investment of nearly <strong data-start=\"789\" data-end=\"811\">VND 3.158 trillion<\/strong>.<\/p>\n<p data-start=\"814\" data-end=\"1032\">According to the recently published environmental impact assessment report, the project is located in <strong data-start=\"916\" data-end=\"975\">Long Hau 3 Hamlet, Can Giuoc District, Long An Province<\/strong>, covering a total area of approximately <strong data-start=\"1016\" data-end=\"1031\">90 hectares<\/strong>.<\/p>\n<p data-start=\"1034\" data-end=\"1198\">The project received official investment approval and investor recognition from local authorities on <strong data-start=\"1135\" data-end=\"1153\">March 31, 2026<\/strong>, paving the way for a new development phase.<\/p>\n<p data-start=\"1200\" data-end=\"1241\">According to the implementation schedule:<\/p>\n<ul data-start=\"1243\" data-end=\"1352\">\n<li data-section-id=\"1sywbnn\" data-start=\"1243\" data-end=\"1279\"><strong data-start=\"1245\" data-end=\"1279\">Construction begins in Q2 2026<\/strong><\/li>\n<li data-section-id=\"qqt0zm\" data-start=\"1280\" data-end=\"1352\"><strong data-start=\"1282\" data-end=\"1352\">Infrastructure completion and investor operations begin in Q3 2028<\/strong><\/li>\n<\/ul>\n<p data-start=\"1354\" data-end=\"1468\">This is considered a strategic move to expand industrial land supply as demand remains strong in Southern Vietnam.<\/p>\n<hr data-start=\"1470\" data-end=\"1473\" \/>\n<h2 data-section-id=\"10pdwis\" data-start=\"1475\" data-end=\"1532\"><span class=\"ez-toc-section\" id=\"What_Does_the_Nearly_VND_32_Trillion_Project_Include\"><\/span>What Does the Nearly VND 3.2 Trillion Project Include?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"1534\" data-end=\"1657\">The Long Hau Industrial Park expansion is designed as a modern industrial development with fully integrated infrastructure.<\/p>\n<p data-start=\"1659\" data-end=\"1693\">Key investment components include:<\/p>\n<ul data-start=\"1695\" data-end=\"1974\">\n<li data-section-id=\"6gpdfk\" data-start=\"1695\" data-end=\"1731\">site leveling and land preparation<\/li>\n<li data-section-id=\"16u1ldt\" data-start=\"1732\" data-end=\"1755\">internal road systems<\/li>\n<li data-section-id=\"sxisiw\" data-start=\"1756\" data-end=\"1784\">electricity infrastructure<\/li>\n<li data-section-id=\"xa084g\" data-start=\"1785\" data-end=\"1820\">water supply and drainage systems<\/li>\n<li data-section-id=\"eej7gu\" data-start=\"1821\" data-end=\"1854\">wastewater treatment facilities<\/li>\n<li data-section-id=\"icfc3z\" data-start=\"1855\" data-end=\"1889\">administrative and service zones<\/li>\n<li data-section-id=\"1b6fhlr\" data-start=\"1890\" data-end=\"1923\">ready-built factories for lease<\/li>\n<li data-section-id=\"3t1ki3\" data-start=\"1924\" data-end=\"1974\">supporting infrastructure for industrial tenants<\/li>\n<\/ul>\n<p data-start=\"1976\" data-end=\"2055\">Total investment is estimated at <strong data-start=\"2009\" data-end=\"2031\">VND 3.158 trillion<\/strong>, structured as follows:<\/p>\n<ul data-start=\"2057\" data-end=\"2181\">\n<li data-section-id=\"192fz4b\" data-start=\"2057\" data-end=\"2096\"><strong data-start=\"2059\" data-end=\"2096\">VND 480 billion in equity capital<\/strong><\/li>\n<li data-section-id=\"bhfpkx\" data-start=\"2097\" data-end=\"2130\"><strong data-start=\"2099\" data-end=\"2130\">VND 1.500 trillion in loans<\/strong><\/li>\n<li data-section-id=\"mm6972\" data-start=\"2131\" data-end=\"2181\">the remaining balance from other funding sources<\/li>\n<\/ul>\n<p data-start=\"2183\" data-end=\"2300\">This capital structure indicates that the developer has prepared a relatively clear financing strategy for execution.<\/p>\n<hr data-start=\"2302\" data-end=\"2305\" \/>\n<h2 data-section-id=\"88ykkx\" data-start=\"2307\" data-end=\"2363\"><span class=\"ez-toc-section\" id=\"Why_Is_Long_Haus_Expansion_Drawing_Market_Attention\"><\/span>Why Is Long Hau\u2019s Expansion Drawing Market Attention?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h2 data-section-id=\"1msrzrr\" data-start=\"2365\" data-end=\"2411\"><span class=\"ez-toc-section\" id=\"1_Strategic_Location_Near_Ho_Chi_Minh_City\"><\/span>1. Strategic Location Near Ho Chi Minh City<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"2413\" data-end=\"2519\">Can Giuoc is one of the strongest beneficiaries of industrial decentralization away from Ho Chi Minh City.<\/p>\n<p data-start=\"2521\" data-end=\"2566\">The area offers several strategic advantages:<\/p>\n<ul data-start=\"2568\" data-end=\"2769\">\n<li data-section-id=\"1wymg8g\" data-start=\"2568\" data-end=\"2605\">close proximity to Ho Chi Minh City<\/li>\n<li data-section-id=\"19j28om\" data-start=\"2606\" data-end=\"2641\">convenient access to South Saigon<\/li>\n<li data-section-id=\"1to31wf\" data-start=\"2642\" data-end=\"2682\">connectivity to seaport infrastructure<\/li>\n<li data-section-id=\"18323qh\" data-start=\"2683\" data-end=\"2718\">favorable import-export logistics<\/li>\n<li data-section-id=\"1k51box\" data-start=\"2719\" data-end=\"2769\">linkage to Southern Vietnam\u2019s expressway network<\/li>\n<\/ul>\n<p data-start=\"2771\" data-end=\"2837\">This is especially attractive for foreign direct investment (FDI).<\/p>\n<p data-start=\"2839\" data-end=\"2882\">Industries likely to be interested include:<\/p>\n<ul data-start=\"2884\" data-end=\"2981\">\n<li data-section-id=\"g9axmj\" data-start=\"2884\" data-end=\"2895\">logistics<\/li>\n<li data-section-id=\"l84ct5\" data-start=\"2896\" data-end=\"2909\">electronics<\/li>\n<li data-section-id=\"d513mj\" data-start=\"2910\" data-end=\"2933\">supporting industries<\/li>\n<li data-section-id=\"b7w2rj\" data-start=\"2934\" data-end=\"2958\">distribution and trade<\/li>\n<li data-section-id=\"187iy4\" data-start=\"2959\" data-end=\"2981\">export manufacturing<\/li>\n<\/ul>\n<hr data-start=\"2983\" data-end=\"2986\" \/>\n<h2 data-section-id=\"1mt4k2j\" data-start=\"2988\" data-end=\"3038\"><span class=\"ez-toc-section\" id=\"2_Long_Hau_Has_a_Proven_Operating_Track_Record\"><\/span>2. Long Hau Has a Proven Operating Track Record<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"3040\" data-end=\"3104\">A major strength is that Long Hau is not a first-time developer.<\/p>\n<p data-start=\"3106\" data-end=\"3137\">The company currently operates:<\/p>\n<ul data-start=\"3139\" data-end=\"3355\">\n<li data-section-id=\"10qgenw\" data-start=\"3139\" data-end=\"3204\"><strong data-start=\"3141\" data-end=\"3204\">Long Hau Industrial Park \u2013 over 137 hectares, 100% occupied<\/strong><\/li>\n<li data-section-id=\"1veyyi1\" data-start=\"3205\" data-end=\"3280\"><strong data-start=\"3207\" data-end=\"3280\">Long Hau Expansion Industrial Park \u2013 over 108 hectares, 100% occupied<\/strong><\/li>\n<li data-section-id=\"1qztkfh\" data-start=\"3281\" data-end=\"3355\"><strong data-start=\"3283\" data-end=\"3355\">Long Hau 3 Phase 1 \u2013 nearly 124 hectares, approximately 60% occupied<\/strong><\/li>\n<\/ul>\n<p data-start=\"3357\" data-end=\"3375\">This demonstrates:<\/p>\n<ul data-start=\"3377\" data-end=\"3522\">\n<li data-section-id=\"xhinak\" data-start=\"3377\" data-end=\"3414\">strong project execution capability<\/li>\n<li data-section-id=\"kje50p\" data-start=\"3415\" data-end=\"3453\">real investor attraction performance<\/li>\n<li data-section-id=\"o8ckx1\" data-start=\"3454\" data-end=\"3487\">an established industrial brand<\/li>\n<li data-section-id=\"cvp73e\" data-start=\"3488\" data-end=\"3522\">an evolving industrial ecosystem<\/li>\n<\/ul>\n<p data-start=\"3524\" data-end=\"3622\">This gives Long Hau a significant competitive advantage over entirely new industrial developments.<\/p>\n<hr data-start=\"3624\" data-end=\"3627\" \/>\n<h2 data-section-id=\"fxohnd\" data-start=\"3629\" data-end=\"3691\"><span class=\"ez-toc-section\" id=\"3_Industrial_Land_Near_Ho_Chi_Minh_City_Is_Becoming_Scarce\"><\/span>3. Industrial Land Near Ho Chi Minh City Is Becoming Scarce<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"3693\" data-end=\"3784\">In areas close to Ho Chi Minh City, clean industrial land is becoming increasingly limited.<\/p>\n<p data-start=\"3786\" data-end=\"3828\">Regions with high occupancy rates include:<\/p>\n<ul data-start=\"3830\" data-end=\"3891\">\n<li data-section-id=\"yg0d7x\" data-start=\"3830\" data-end=\"3839\">Long An<\/li>\n<li data-section-id=\"7ct32q\" data-start=\"3840\" data-end=\"3852\">Binh Duong<\/li>\n<li data-section-id=\"1f5ur64\" data-start=\"3853\" data-end=\"3863\">Dong Nai<\/li>\n<li data-section-id=\"3ooqyu\" data-start=\"3864\" data-end=\"3891\">suburban Ho Chi Minh City<\/li>\n<\/ul>\n<p data-start=\"3893\" data-end=\"3972\">As a result, new industrial land supply consistently attracts market attention.<\/p>\n<p data-start=\"3974\" data-end=\"4042\">The additional 90 hectares therefore carries strong strategic value.<\/p>\n<hr data-start=\"4044\" data-end=\"4047\" \/>\n<h2 data-section-id=\"i3fgi8\" data-start=\"4049\" data-end=\"4108\"><span class=\"ez-toc-section\" id=\"4_Global_Supply_Chain_Shifts_Continue_Supporting_Demand\"><\/span>4. Global Supply Chain Shifts Continue Supporting Demand<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"4110\" data-end=\"4179\">Vietnam continues benefiting from major investment trends, including:<\/p>\n<ul data-start=\"4181\" data-end=\"4309\">\n<li data-section-id=\"c7jg58\" data-start=\"4181\" data-end=\"4213\">China Plus One diversification<\/li>\n<li data-section-id=\"98khtd\" data-start=\"4214\" data-end=\"4242\">supply chain restructuring<\/li>\n<li data-section-id=\"tkzmnd\" data-start=\"4243\" data-end=\"4270\">regional logistics demand<\/li>\n<li data-section-id=\"sojmvg\" data-start=\"4271\" data-end=\"4290\">e-commerce growth<\/li>\n<li data-section-id=\"1n11kz9\" data-start=\"4291\" data-end=\"4309\">export expansion<\/li>\n<\/ul>\n<p data-start=\"4311\" data-end=\"4362\">Industries likely to consider this project include:<\/p>\n<ul data-start=\"4364\" data-end=\"4491\">\n<li data-section-id=\"l84ct5\" data-start=\"4364\" data-end=\"4377\">electronics<\/li>\n<li data-section-id=\"jorfbc\" data-start=\"4378\" data-end=\"4391\">warehousing<\/li>\n<li data-section-id=\"1g9e66q\" data-start=\"4392\" data-end=\"4414\">cold chain logistics<\/li>\n<li data-section-id=\"141lpl3\" data-start=\"4415\" data-end=\"4441\">supporting manufacturing<\/li>\n<li data-section-id=\"aqjrpo\" data-start=\"4442\" data-end=\"4464\">electrical equipment<\/li>\n<li data-section-id=\"1iuryoe\" data-start=\"4465\" data-end=\"4491\">technology manufacturing<\/li>\n<\/ul>\n<hr data-start=\"4493\" data-end=\"4496\" \/>\n<h2 data-section-id=\"ewa3cz\" data-start=\"4498\" data-end=\"4551\"><span class=\"ez-toc-section\" id=\"Current_Land_Conditions_and_Development_Challenges\"><\/span>Current Land Conditions and Development Challenges<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"4553\" data-end=\"4630\">According to the environmental report, the site currently consists mainly of:<\/p>\n<ul data-start=\"4632\" data-end=\"4749\">\n<li data-section-id=\"52wc6u\" data-start=\"4632\" data-end=\"4651\">agricultural land<\/li>\n<li data-section-id=\"1fp0mwy\" data-start=\"4652\" data-end=\"4671\">acid sulfate soil<\/li>\n<li data-section-id=\"1g2arbg\" data-start=\"4672\" data-end=\"4694\">saline-affected land<\/li>\n<li data-section-id=\"1j6p1p3\" data-start=\"4695\" data-end=\"4722\">partial aquaculture areas<\/li>\n<li data-section-id=\"1sxp4bl\" data-start=\"4723\" data-end=\"4749\">partially abandoned land<\/li>\n<\/ul>\n<p data-start=\"4751\" data-end=\"4774\">The site also includes:<\/p>\n<ul data-start=\"4776\" data-end=\"4871\">\n<li data-section-id=\"m6yft2\" data-start=\"4776\" data-end=\"4815\">approximately <strong data-start=\"4792\" data-end=\"4815\">61 temporary houses<\/strong><\/li>\n<li data-section-id=\"l1wsyw\" data-start=\"4816\" data-end=\"4846\">approximately <strong data-start=\"4832\" data-end=\"4846\">100 graves<\/strong><\/li>\n<li data-section-id=\"1kbef73\" data-start=\"4847\" data-end=\"4871\">low population density<\/li>\n<\/ul>\n<p data-start=\"4873\" data-end=\"4921\">This presents both opportunities and challenges.<\/p>\n<h3 data-section-id=\"1l3n95q\" data-start=\"4923\" data-end=\"4937\"><span class=\"ez-toc-section\" id=\"Advantages\"><\/span>Advantages<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul data-start=\"4939\" data-end=\"5023\">\n<li data-section-id=\"o6v16z\" data-start=\"4939\" data-end=\"4967\">easier integrated planning<\/li>\n<li data-section-id=\"1ivw0l4\" data-start=\"4968\" data-end=\"4994\">lower population density<\/li>\n<li data-section-id=\"1m4kw\" data-start=\"4995\" data-end=\"5023\">large contiguous land bank<\/li>\n<\/ul>\n<h3 data-section-id=\"1o5hnx2\" data-start=\"5025\" data-end=\"5039\"><span class=\"ez-toc-section\" id=\"Challenges\"><\/span>Challenges<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul data-start=\"5041\" data-end=\"5162\">\n<li data-section-id=\"3iy6v4\" data-start=\"5041\" data-end=\"5074\">land clearance and compensation<\/li>\n<li data-section-id=\"1t9l9yd\" data-start=\"5075\" data-end=\"5113\">technical infrastructure preparation<\/li>\n<li data-section-id=\"1vil7bh\" data-start=\"5114\" data-end=\"5135\">weak soil treatment<\/li>\n<li data-section-id=\"rx88g3\" data-start=\"5136\" data-end=\"5162\">environmental management<\/li>\n<\/ul>\n<hr data-start=\"5164\" data-end=\"5167\" \/>\n<h2 data-section-id=\"t93ru1\" data-start=\"5169\" data-end=\"5201\"><span class=\"ez-toc-section\" id=\"Long_Haus_Financial_Position\"><\/span>Long Hau\u2019s Financial Position<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"5203\" data-end=\"5250\">Financial strength is another important factor.<\/p>\n<p data-start=\"5252\" data-end=\"5273\">Q1 2026 results show:<\/p>\n<ul data-start=\"5275\" data-end=\"5354\">\n<li data-section-id=\"1wnexif\" data-start=\"5275\" data-end=\"5314\"><strong data-start=\"5277\" data-end=\"5314\">Revenue exceeding VND 176 billion<\/strong><\/li>\n<li data-section-id=\"15nefg3\" data-start=\"5315\" data-end=\"5354\">down approximately 25% year-over-year<\/li>\n<\/ul>\n<p data-start=\"5356\" data-end=\"5364\">However:<\/p>\n<ul data-start=\"5366\" data-end=\"5445\">\n<li data-section-id=\"50c5z\" data-start=\"5366\" data-end=\"5407\"><strong data-start=\"5368\" data-end=\"5407\">Net profit exceeded VND 112 billion<\/strong><\/li>\n<li data-section-id=\"1yf7g5y\" data-start=\"5408\" data-end=\"5445\">supported by strong cost management<\/li>\n<\/ul>\n<p data-start=\"5447\" data-end=\"5460\">2026 targets:<\/p>\n<ul data-start=\"5462\" data-end=\"5552\">\n<li data-section-id=\"c8zed\" data-start=\"5462\" data-end=\"5504\"><strong data-start=\"5464\" data-end=\"5504\">Revenue target: over VND 728 billion<\/strong><\/li>\n<li data-section-id=\"7eysa1\" data-start=\"5505\" data-end=\"5552\"><strong data-start=\"5507\" data-end=\"5552\">Net profit target: nearly VND 166 billion<\/strong><\/li>\n<\/ul>\n<p data-start=\"5554\" data-end=\"5604\">After the first quarter, the company had achieved:<\/p>\n<ul data-start=\"5606\" data-end=\"5674\">\n<li data-section-id=\"1hj241d\" data-start=\"5606\" data-end=\"5640\"><strong data-start=\"5608\" data-end=\"5640\">34% of annual revenue target<\/strong><\/li>\n<li data-section-id=\"1hicbsk\" data-start=\"5641\" data-end=\"5674\"><strong data-start=\"5643\" data-end=\"5674\">68% of annual profit target<\/strong><\/li>\n<\/ul>\n<p data-start=\"5676\" data-end=\"5749\">This provides relatively positive signals for project execution capacity.<\/p>\n<hr data-start=\"5751\" data-end=\"5754\" \/>\n<h2 data-section-id=\"7sacaz\" data-start=\"5756\" data-end=\"5795\"><span class=\"ez-toc-section\" id=\"Which_Investors_Could_Be_Interested\"><\/span>Which Investors Could Be Interested?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"5797\" data-end=\"5865\">Based on location and project design, likely target tenants include:<\/p>\n<h3 data-section-id=\"ccuqme\" data-start=\"5867\" data-end=\"5890\"><span class=\"ez-toc-section\" id=\"Logistics_Operators\"><\/span>Logistics Operators<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"5892\" data-end=\"5953\">Strong proximity to Ho Chi Minh City and port infrastructure.<\/p>\n<hr data-start=\"5955\" data-end=\"5958\" \/>\n<h3 data-section-id=\"1t7rr46\" data-start=\"5960\" data-end=\"5984\"><span class=\"ez-toc-section\" id=\"Export_Manufacturers\"><\/span>Export Manufacturers<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"5986\" data-end=\"6037\">Efficient transport access for international trade.<\/p>\n<hr data-start=\"6039\" data-end=\"6042\" \/>\n<h3 data-section-id=\"nx6sad\" data-start=\"6044\" data-end=\"6069\"><span class=\"ez-toc-section\" id=\"Supporting_Industries\"><\/span>Supporting Industries<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"6071\" data-end=\"6119\">Serving Southern Vietnam\u2019s industrial ecosystem.<\/p>\n<hr data-start=\"6121\" data-end=\"6124\" \/>\n<h3 data-section-id=\"1uida1c\" data-start=\"6126\" data-end=\"6155\"><span class=\"ez-toc-section\" id=\"Ready-Built_Factory_Users\"><\/span>Ready-Built Factory Users<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"6157\" data-end=\"6199\">Businesses seeking fast operational setup.<\/p>\n<hr data-start=\"6201\" data-end=\"6204\" \/>\n<h3 data-section-id=\"1betj2e\" data-start=\"6206\" data-end=\"6246\"><span class=\"ez-toc-section\" id=\"Cold_Chain_and_Food_Supply_Logistics\"><\/span>Cold Chain and Food Supply Logistics<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"6248\" data-end=\"6306\">Southern Vietnam has strong demand growth in this segment.<\/p>\n<hr data-start=\"6308\" data-end=\"6311\" \/>\n<h2 data-section-id=\"m6byv\" data-start=\"6313\" data-end=\"6372\"><span class=\"ez-toc-section\" id=\"Market_Impact_on_Vietnams_Industrial_Real_Estate_Sector\"><\/span>Market Impact on Vietnam\u2019s Industrial Real Estate Sector<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"6374\" data-end=\"6426\">This project carries several important implications.<\/p>\n<h3 data-section-id=\"11mxk4f\" data-start=\"6428\" data-end=\"6460\"><span class=\"ez-toc-section\" id=\"New_Industrial_Supply_Growth\"><\/span>New Industrial Supply Growth<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"6462\" data-end=\"6518\">90 hectares is a meaningful addition to Southern supply.<\/p>\n<hr data-start=\"6520\" data-end=\"6523\" \/>\n<h3 data-section-id=\"r5ddo1\" data-start=\"6525\" data-end=\"6561\"><span class=\"ez-toc-section\" id=\"Increased_Competition_in_Long_An\"><\/span>Increased Competition in Long An<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"6563\" data-end=\"6632\">Long An continues strengthening its role as an industrial growth hub.<\/p>\n<hr data-start=\"6634\" data-end=\"6637\" \/>\n<h3 data-section-id=\"1p9eddu\" data-start=\"6639\" data-end=\"6654\"><span class=\"ez-toc-section\" id=\"FDI_Support\"><\/span>FDI Support<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"6656\" data-end=\"6726\">New industrial land helps absorb rising international investor demand.<\/p>\n<hr data-start=\"6728\" data-end=\"6731\" \/>\n<h3 data-section-id=\"5x9h8b\" data-start=\"6733\" data-end=\"6781\"><span class=\"ez-toc-section\" id=\"Reinforcement_of_Industrial_Decentralization\"><\/span>Reinforcement of Industrial Decentralization<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"6783\" data-end=\"6877\">More businesses continue shifting from central Ho Chi Minh City to satellite industrial zones.<\/p>\n<hr data-start=\"6879\" data-end=\"6882\" \/>\n<h2 data-section-id=\"8dtpi\" data-start=\"6884\" data-end=\"6897\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"6899\" data-end=\"7045\">Long Hau\u2019s nearly <strong data-start=\"6917\" data-end=\"6948\">VND 3.2 trillion investment<\/strong> to expand industrial land by <strong data-start=\"6978\" data-end=\"7006\">90 hectares in Can Giuoc<\/strong> represents a strategically timed move.<\/p>\n<p data-start=\"7047\" data-end=\"7071\">Against the backdrop of:<\/p>\n<ul data-start=\"7073\" data-end=\"7224\">\n<li data-section-id=\"1a52flw\" data-start=\"7073\" data-end=\"7120\">limited industrial land near Ho Chi Minh City<\/li>\n<li data-section-id=\"14uzn64\" data-start=\"7121\" data-end=\"7140\">rising FDI demand<\/li>\n<li data-section-id=\"q4va17\" data-start=\"7141\" data-end=\"7188\">rapid logistics expansion in Southern Vietnam<\/li>\n<li data-section-id=\"1f587yy\" data-start=\"7189\" data-end=\"7224\">global supply chain restructuring<\/li>\n<\/ul>\n<p data-start=\"7226\" data-end=\"7356\">the Long Hau expansion has strong potential to become one of Vietnam\u2019s most attractive industrial investment destinations by 2028.<\/p>\n<p data-start=\"7358\" data-end=\"7500\"><strong data-start=\"7358\" data-end=\"7500\">If delivered on schedule, this project could become a major catalyst for Long An\u2019s industrial real estate growth in the next market cycle.<\/strong><\/p>\n<p data-start=\"5726\" data-end=\"5748\"><strong data-start=\"5726\" data-end=\"5746\">References:<\/strong><\/p>\n<ul data-start=\"5749\" data-end=\"5903\">\n<li data-section-id=\"qg9xo1\" data-start=\"5749\" data-end=\"5815\">\n<p data-start=\"5751\" data-end=\"5815\"><a class=\"decorated-link\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_new\" rel=\"noopener\" data-start=\"5751\" data-end=\"5813\">Dat Khu C\u00f4ng Nghi\u1ec7p 247<\/a><\/p>\n<\/li>\n<\/ul>\n<h1><span class=\"ez-toc-section\" id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><strong>Free access to exclusive information on warehouse, factory, and land rentals in Dong Nai, Binh Duong, Long An, Ho Chi Minh City, and more.<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p><a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_blank\" rel=\"noopener\"><strong>KHU C\u00d4NG NGHI\u1ec6P 247\u00a0<\/strong><\/a>is a company operating in the field of buying, selling, and leasing factories and real estate<strong>.<\/strong>.\u00a0<a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_blank\" rel=\"noopener\">We<\/a>\u00a0are proud to be a leading provider of real estate services in Vietnam. We have a team of highly qualified and experienced real estate consultants who always place trust and credibility at the core of everything we do<a href=\"https:\/\/jsc-vietnam.com\/khu-che-xuat-la-gi-vai-tro-va-loi-ich\/\" target=\"_blank\" rel=\"noopener\">.<\/a><\/p>\n<p><strong>Phone:<\/strong>\u00a0<strong>0901 490 348<\/strong><\/p>\n<p><strong>Email:\u00a0<\/strong>datkhucongnghiep247@gmail.com<\/p>\n<p><strong>Website:\u00a0<\/strong><a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_blank\" rel=\"noopener\">datkhucongnghiep247.com.vn<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Long Hau Industrial Park is accelerating its expansion with a nearly VND 3.2 trillion project in Can Giuoc, Long An. With an additional 90 hectares of industrial land, the development is expected to become a prime destination for manufacturing, logistics, and technology investors during Vietnam\u2019s next industrial growth cycle from 2028 onward. Long Hau Accelerates [&#8230;]\n","protected":false},"author":12,"featured_media":6531,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_focus_keyword":"Industrial Park,long an","rank_math_title":"","rank_math_description":""},"categories":[1],"tags":[],"class_list":["post-6530","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"_links":{"self":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts\/6530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/comments?post=6530"}],"version-history":[{"count":1,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts\/6530\/revisions"}],"predecessor-version":[{"id":6532,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts\/6530\/revisions\/6532"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/media\/6531"}],"wp:attachment":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/media?parent=6530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/categories?post=6530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/tags?post=6530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}