{"id":6435,"date":"2026-05-19T10:09:21","date_gmt":"2026-05-19T03:09:21","guid":{"rendered":"https:\/\/datkhucongnghiep247.com.vn\/en\/?p=6435"},"modified":"2026-05-19T10:09:21","modified_gmt":"2026-05-19T03:09:21","slug":"southern-industrial-real-estate-2026","status":"publish","type":"post","link":"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/","title":{"rendered":"Southern Industrial Real Estate 2026: Over 5,300 Hectares of New Industrial Land and 1.6 Million m\u00b2 of Warehousing Supply Coming Soon"},"content":{"rendered":"<p data-start=\"137\" data-end=\"682\"><strong data-start=\"137\" data-end=\"189\">Southern Vietnam\u2019s industrial real estate market<\/strong> is entering a new growth cycle as the region prepares to welcome more than <strong data-start=\"265\" data-end=\"306\">5,300 hectares of new industrial land<\/strong> and approximately <strong data-start=\"325\" data-end=\"394\">1.6 million square meters of ready-built factories and warehouses<\/strong> between 2026 and 2029. As <strong data-start=\"421\" data-end=\"449\">high-quality FDI capital<\/strong> continues flowing into Vietnam, Southern Vietnam is expected to strengthen its position as a strategic manufacturing and logistics hub with modern industrial infrastructure, large-scale supply, and international operating standards.<img loading=\"lazy\" decoding=\"async\" class=\" wp-image-6436 aligncenter\" src=\"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-content\/uploads\/2026\/05\/64d142d5-13c2-4342-8c3a-d3c213671be3.png\" alt=\"industrial-real-estate.webp\" width=\"605\" height=\"403\" srcset=\"https:\/\/industrialland.com.vn\/en\/wp-content\/uploads\/2026\/05\/64d142d5-13c2-4342-8c3a-d3c213671be3.png 1536w, https:\/\/industrialland.com.vn\/en\/wp-content\/uploads\/2026\/05\/64d142d5-13c2-4342-8c3a-d3c213671be3-768x512.png 768w, https:\/\/industrialland.com.vn\/en\/wp-content\/uploads\/2026\/05\/64d142d5-13c2-4342-8c3a-d3c213671be3-510x340.png 510w\" sizes=\"auto, (max-width: 605px) 100vw, 605px\" \/><\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_81 ez-toc-wrap-center counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">M\u1ee4C L\u1ee4C<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><ul class='ez-toc-list-level-2' ><li class='ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Southern_Industrial_Real_Estate_Enters_a_New_Expansion_Phase\" >Southern Industrial Real Estate Enters a New Expansion Phase<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#More_Than_5300_Hectares_of_New_Industrial_Land_to_Enter_the_Market\" >More Than 5,300 Hectares of New Industrial Land to Enter the Market<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Ho_Chi_Minh_City\" >Ho Chi Minh City<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Tay_Ninh\" >Tay Ninh<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Dong_Nai\" >Dong Nai<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#16_Million_Square_Meters_of_Ready-Built_Industrial_Space_Coming\" >1.6 Million Square Meters of Ready-Built Industrial Space Coming<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Ready-Built_Factories_RBF\" >Ready-Built Factories (RBF)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Ready-Built_Warehouses_RBW\" >Ready-Built Warehouses (RBW)<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Why_Southern_Vietnams_Industrial_Real_Estate_Remains_Highly_Attractive\" >Why Southern Vietnam\u2019s Industrial Real Estate Remains Highly Attractive<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#1_High-Quality_FDI_Continues_to_Accelerate\" >1. High-Quality FDI Continues to Accelerate<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#2_Regional_Infrastructure_Is_Creating_Major_Momentum\" >2. Regional Infrastructure Is Creating Major Momentum<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#3_Factory_Relocation_Toward_Satellite_Provinces_Is_Accelerating\" >3. Factory Relocation Toward Satellite Provinces Is Accelerating<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Current_Market_Performance\" >Current Market Performance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Industrial_Land_Segment\" >Industrial Land Segment<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#By_Market\" >By Market<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Ready-Built_Factories_Are_Growing_Rapidly\" >Ready-Built Factories Are Growing Rapidly<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Dong_Nai_Leads\" >Dong Nai Leads<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Southern_Warehousing_Market_Near_Full_Capacity\" >Southern Warehousing Market Near Full Capacity<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Ho_Chi_Minh_City_Nearly_Fully_Occupied\" >Ho Chi Minh City Nearly Fully Occupied<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Current_Rental_Rates\" >Current Rental Rates<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Ready-Built_Factories\" >Ready-Built Factories<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Ready-Built_Warehouses\" >Ready-Built Warehouses<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#ESG_Is_Becoming_a_Core_Requirement\" >ESG Is Becoming a Core Requirement<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Who_Benefits_Most_from_This_Growth_Cycle\" >Who Benefits Most from This Growth Cycle?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Industrial_Park_Developers\" >Industrial Park Developers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Logistics_Operators\" >Logistics Operators<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Industrial_Real_Estate_Investors\" >Industrial Real Estate Investors<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Long-Term_Outlook\" >Long-Term Outlook<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Conclusion\" >Conclusion<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/industrialland.com.vn\/en\/southern-industrial-real-estate-2026\/#Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" >Free access to exclusive information on warehouse, factory, and land rentals in Dong Nai, Binh Duong, Long An, Ho Chi Minh City, and more.<\/a><\/li><\/ul><\/nav><\/div>\n\n<p data-start=\"684\" data-end=\"868\">The combination of regional infrastructure expansion, global logistics connectivity, and the upgrading of industrial park quality is creating a powerful new growth wave for the market.<\/p>\n<h2 data-section-id=\"1q9ntbq\" data-start=\"870\" data-end=\"933\"><span class=\"ez-toc-section\" id=\"Southern_Industrial_Real_Estate_Enters_a_New_Expansion_Phase\"><\/span>Southern Industrial Real Estate Enters a New Expansion Phase<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"935\" data-end=\"1050\">The market is no longer growing solely through land expansion. Instead, it is shifting toward competition based on:<\/p>\n<ul data-start=\"1052\" data-end=\"1184\">\n<li data-section-id=\"13s1yip\" data-start=\"1052\" data-end=\"1068\">tenant quality<\/li>\n<li data-section-id=\"87h260\" data-start=\"1069\" data-end=\"1092\">operational standards<\/li>\n<li data-section-id=\"i40f18\" data-start=\"1093\" data-end=\"1119\">logistics infrastructure<\/li>\n<li data-section-id=\"1oxbdac\" data-start=\"1120\" data-end=\"1136\">ESG compliance<\/li>\n<li data-section-id=\"544grb\" data-start=\"1137\" data-end=\"1149\">automation<\/li>\n<li data-section-id=\"1bvyoc9\" data-start=\"1150\" data-end=\"1184\">support for high-tech industries<\/li>\n<\/ul>\n<p data-start=\"1186\" data-end=\"1291\">This indicates a more mature, professional, and internationally attractive industrial real estate market.<\/p>\n<h2 data-section-id=\"aans8d\" data-start=\"1293\" data-end=\"1363\"><span class=\"ez-toc-section\" id=\"More_Than_5300_Hectares_of_New_Industrial_Land_to_Enter_the_Market\"><\/span>More Than 5,300 Hectares of New Industrial Land to Enter the Market<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"1365\" data-end=\"1425\">The <strong data-start=\"1369\" data-end=\"1405\">southern industrial land segment<\/strong> is expected to add:<\/p>\n<ul data-start=\"1427\" data-end=\"1470\">\n<li data-section-id=\"1sls8p7\" data-start=\"1427\" data-end=\"1470\"><strong data-start=\"1429\" data-end=\"1470\">5,347 hectares of new industrial land<\/strong><\/li>\n<\/ul>\n<p data-start=\"1472\" data-end=\"1479\">during:<\/p>\n<ul data-start=\"1481\" data-end=\"1496\">\n<li data-section-id=\"2aksms\" data-start=\"1481\" data-end=\"1496\"><strong data-start=\"1483\" data-end=\"1496\">2026\u20132029<\/strong><\/li>\n<\/ul>\n<p data-start=\"1498\" data-end=\"1516\">Supply allocation:<\/p>\n<h3 data-section-id=\"196jeme\" data-start=\"1518\" data-end=\"1538\"><span class=\"ez-toc-section\" id=\"Ho_Chi_Minh_City\"><\/span>Ho Chi Minh City<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul data-start=\"1540\" data-end=\"1580\">\n<li data-section-id=\"1vguo0r\" data-start=\"1540\" data-end=\"1580\">approximately <strong data-start=\"1556\" data-end=\"1580\">59% of future supply<\/strong><\/li>\n<\/ul>\n<h3 data-section-id=\"w4iaqz\" data-start=\"1582\" data-end=\"1594\"><span class=\"ez-toc-section\" id=\"Tay_Ninh\"><\/span>Tay Ninh<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul data-start=\"1596\" data-end=\"1634\">\n<li data-section-id=\"1uvn0ip\" data-start=\"1596\" data-end=\"1634\">one of the next largest contributors<\/li>\n<\/ul>\n<h3 data-section-id=\"1od9uhu\" data-start=\"1636\" data-end=\"1648\"><span class=\"ez-toc-section\" id=\"Dong_Nai\"><\/span>Dong Nai<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul data-start=\"1650\" data-end=\"1711\">\n<li data-section-id=\"xeu0tz\" data-start=\"1650\" data-end=\"1711\">strong continued expansion due to infrastructure advantages<\/li>\n<\/ul>\n<p data-start=\"1713\" data-end=\"1824\">This reflects the growing shift toward satellite provinces with larger land reserves and lower operating costs.<\/p>\n<h2 data-section-id=\"1fbctxu\" data-start=\"1826\" data-end=\"1893\"><span class=\"ez-toc-section\" id=\"16_Million_Square_Meters_of_Ready-Built_Industrial_Space_Coming\"><\/span>1.6 Million Square Meters of Ready-Built Industrial Space Coming<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"1895\" data-end=\"1970\">Beyond land supply, completed industrial assets are also expanding rapidly.<\/p>\n<h3 data-section-id=\"1cp1wxv\" data-start=\"1972\" data-end=\"2003\"><span class=\"ez-toc-section\" id=\"Ready-Built_Factories_RBF\"><\/span>Ready-Built Factories (RBF)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"2005\" data-end=\"2032\">Expected additional supply:<\/p>\n<ul data-start=\"2034\" data-end=\"2064\">\n<li data-section-id=\"1lsxohj\" data-start=\"2034\" data-end=\"2064\">approximately <strong data-start=\"2050\" data-end=\"2064\">944,000 m\u00b2<\/strong><\/li>\n<\/ul>\n<h3 data-section-id=\"otdkae\" data-start=\"2066\" data-end=\"2098\"><span class=\"ez-toc-section\" id=\"Ready-Built_Warehouses_RBW\"><\/span>Ready-Built Warehouses (RBW)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"2100\" data-end=\"2127\">Expected additional supply:<\/p>\n<ul data-start=\"2129\" data-end=\"2159\">\n<li data-section-id=\"ihzjpb\" data-start=\"2129\" data-end=\"2159\">approximately <strong data-start=\"2145\" data-end=\"2159\">661,000 m\u00b2<\/strong><\/li>\n<\/ul>\n<p data-start=\"2161\" data-end=\"2167\">Total:<\/p>\n<ul data-start=\"2169\" data-end=\"2194\">\n<li data-section-id=\"1alppzw\" data-start=\"2169\" data-end=\"2194\">over <strong data-start=\"2176\" data-end=\"2194\">1.6 million m\u00b2<\/strong><\/li>\n<\/ul>\n<p data-start=\"2196\" data-end=\"2305\">This is highly attractive for manufacturers seeking rapid expansion without large upfront construction costs.<\/p>\n<h2 data-section-id=\"pmqujx\" data-start=\"2307\" data-end=\"2381\"><span class=\"ez-toc-section\" id=\"Why_Southern_Vietnams_Industrial_Real_Estate_Remains_Highly_Attractive\"><\/span>Why Southern Vietnam\u2019s Industrial Real Estate Remains Highly Attractive<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h2 data-section-id=\"1hmrt7d\" data-start=\"2383\" data-end=\"2429\"><span class=\"ez-toc-section\" id=\"1_High-Quality_FDI_Continues_to_Accelerate\"><\/span>1. High-Quality FDI Continues to Accelerate<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"2431\" data-end=\"2501\">Vietnam remains one of Asia\u2019s most attractive investment destinations.<\/p>\n<p data-start=\"2503\" data-end=\"2541\">Key demand-driving industries include:<\/p>\n<ul data-start=\"2543\" data-end=\"2665\">\n<li data-section-id=\"l84ct5\" data-start=\"2543\" data-end=\"2556\">electronics<\/li>\n<li data-section-id=\"1mlkg1c\" data-start=\"2557\" data-end=\"2573\">semiconductors<\/li>\n<li data-section-id=\"vuk55z\" data-start=\"2574\" data-end=\"2597\">precision engineering<\/li>\n<li data-section-id=\"d513mj\" data-start=\"2598\" data-end=\"2621\">supporting industries<\/li>\n<li data-section-id=\"1hmm3hg\" data-start=\"2622\" data-end=\"2640\">modern logistics<\/li>\n<li data-section-id=\"fbicuu\" data-start=\"2641\" data-end=\"2665\">advanced manufacturing<\/li>\n<\/ul>\n<p data-start=\"2667\" data-end=\"2711\">International investors increasingly demand:<\/p>\n<ul data-start=\"2713\" data-end=\"2849\">\n<li data-section-id=\"1tvfv9j\" data-start=\"2713\" data-end=\"2748\">international operating standards<\/li>\n<li data-section-id=\"s35q1n\" data-start=\"2749\" data-end=\"2785\">professional industrial ecosystems<\/li>\n<li data-section-id=\"1kufzco\" data-start=\"2786\" data-end=\"2812\">ESG-compliant facilities<\/li>\n<li data-section-id=\"4wfge9\" data-start=\"2813\" data-end=\"2849\">optimized logistics infrastructure<\/li>\n<\/ul>\n<hr data-start=\"2851\" data-end=\"2854\" \/>\n<h2 data-section-id=\"1oizutf\" data-start=\"2856\" data-end=\"2912\"><span class=\"ez-toc-section\" id=\"2_Regional_Infrastructure_Is_Creating_Major_Momentum\"><\/span>2. Regional Infrastructure Is Creating Major Momentum<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"2914\" data-end=\"2998\">Large-scale infrastructure projects are reshaping Southern Vietnam\u2019s industrial map.<\/p>\n<p data-start=\"3000\" data-end=\"3023\">Major projects include:<\/p>\n<ul data-start=\"3025\" data-end=\"3198\">\n<li data-section-id=\"u74zzl\" data-start=\"3025\" data-end=\"3038\">Ring Road 3<\/li>\n<li data-section-id=\"u74zzq\" data-start=\"3039\" data-end=\"3052\">Ring Road 4<\/li>\n<li data-section-id=\"1lnorqk\" data-start=\"3053\" data-end=\"3086\">Ben Luc \u2013 Long Thanh Expressway<\/li>\n<li data-section-id=\"16rtwzm\" data-start=\"3087\" data-end=\"3119\">Bien Hoa \u2013 Vung Tau Expressway<\/li>\n<li data-section-id=\"mjt4gg\" data-start=\"3120\" data-end=\"3152\">Cai Mep \u2013 Thi Vai Port Cluster<\/li>\n<li data-section-id=\"1eavn86\" data-start=\"3153\" data-end=\"3198\">Can Gio transshipment port development plan<\/li>\n<\/ul>\n<p data-start=\"3200\" data-end=\"3266\">These projects are opening new industrial and logistics corridors.<\/p>\n<hr data-start=\"3268\" data-end=\"3271\" \/>\n<h2 data-section-id=\"1lmp0an\" data-start=\"3273\" data-end=\"3340\"><span class=\"ez-toc-section\" id=\"3_Factory_Relocation_Toward_Satellite_Provinces_Is_Accelerating\"><\/span>3. Factory Relocation Toward Satellite Provinces Is Accelerating<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"3342\" data-end=\"3427\">As Ho Chi Minh City faces increasing land scarcity, manufacturers are expanding into:<\/p>\n<ul data-start=\"3429\" data-end=\"3483\">\n<li data-section-id=\"1f5ur64\" data-start=\"3429\" data-end=\"3439\">Dong Nai<\/li>\n<li data-section-id=\"o7dmit\" data-start=\"3440\" data-end=\"3450\">Tay Ninh<\/li>\n<li data-section-id=\"7ct32q\" data-start=\"3451\" data-end=\"3463\">Binh Duong<\/li>\n<li data-section-id=\"1qlhiy0\" data-start=\"3464\" data-end=\"3483\">Ba Ria \u2013 Vung Tau<\/li>\n<\/ul>\n<p data-start=\"3485\" data-end=\"3500\">Key advantages:<\/p>\n<ul data-start=\"3502\" data-end=\"3603\">\n<li data-section-id=\"1nionw3\" data-start=\"3502\" data-end=\"3524\">larger land reserves<\/li>\n<li data-section-id=\"dcp1ci\" data-start=\"3525\" data-end=\"3551\">more competitive pricing<\/li>\n<li data-section-id=\"r3r7fr\" data-start=\"3552\" data-end=\"3572\">better scalability<\/li>\n<li data-section-id=\"hts53r\" data-start=\"3573\" data-end=\"3603\">efficient regional logistics<\/li>\n<\/ul>\n<h2 data-section-id=\"51nfcg\" data-start=\"3605\" data-end=\"3634\"><span class=\"ez-toc-section\" id=\"Current_Market_Performance\"><\/span>Current Market Performance<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h2 data-section-id=\"111sapy\" data-start=\"3636\" data-end=\"3662\"><span class=\"ez-toc-section\" id=\"Industrial_Land_Segment\"><\/span>Industrial Land Segment<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"3664\" data-end=\"3672\">Q1 2026:<\/p>\n<p data-start=\"3674\" data-end=\"3690\"><strong data-start=\"3674\" data-end=\"3690\">Total supply<\/strong><\/p>\n<ul data-start=\"3692\" data-end=\"3727\">\n<li data-section-id=\"c6cdov\" data-start=\"3692\" data-end=\"3727\">approximately <strong data-start=\"3708\" data-end=\"3727\">36,400 hectares<\/strong><\/li>\n<\/ul>\n<p data-start=\"3729\" data-end=\"3747\"><strong data-start=\"3729\" data-end=\"3747\">Occupancy rate<\/strong><\/p>\n<ul data-start=\"3749\" data-end=\"3760\">\n<li data-section-id=\"1sap5p4\" data-start=\"3749\" data-end=\"3760\"><strong data-start=\"3751\" data-end=\"3760\">74.8%<\/strong><\/li>\n<\/ul>\n<p data-start=\"3762\" data-end=\"3780\"><strong data-start=\"3762\" data-end=\"3780\">Net absorption<\/strong><\/p>\n<ul data-start=\"3782\" data-end=\"3814\">\n<li data-section-id=\"111ls92\" data-start=\"3782\" data-end=\"3814\">approximately <strong data-start=\"3798\" data-end=\"3814\">127 hectares<\/strong><\/li>\n<\/ul>\n<p data-start=\"3816\" data-end=\"3839\"><strong data-start=\"3816\" data-end=\"3839\">Average lease price<\/strong><\/p>\n<ul data-start=\"3841\" data-end=\"3883\">\n<li data-section-id=\"1f6lqm4\" data-start=\"3841\" data-end=\"3883\"><strong data-start=\"3843\" data-end=\"3859\">USD 186.6\/m\u00b2<\/strong> for the full lease term<\/li>\n<\/ul>\n<hr data-start=\"3885\" data-end=\"3888\" \/>\n<h3 data-section-id=\"i9ze8p\" data-start=\"3890\" data-end=\"3903\"><span class=\"ez-toc-section\" id=\"By_Market\"><\/span>By Market<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"3905\" data-end=\"3925\"><strong data-start=\"3905\" data-end=\"3925\">Ho Chi Minh City<\/strong><\/p>\n<ul data-start=\"3927\" data-end=\"4027\">\n<li data-section-id=\"1erxbgy\" data-start=\"3927\" data-end=\"3953\">occupancy nearly <strong data-start=\"3946\" data-end=\"3953\">85%<\/strong><\/li>\n<li data-section-id=\"12dgnav\" data-start=\"3954\" data-end=\"3988\">lease rates above <strong data-start=\"3974\" data-end=\"3988\">USD 184\/m\u00b2<\/strong><\/li>\n<li data-section-id=\"q2umtk\" data-start=\"3989\" data-end=\"4027\">increasingly limited industrial land<\/li>\n<\/ul>\n<p data-start=\"4029\" data-end=\"4041\"><strong data-start=\"4029\" data-end=\"4041\">Dong Nai<\/strong><\/p>\n<ul data-start=\"4043\" data-end=\"4089\">\n<li data-section-id=\"1s73vqy\" data-start=\"4043\" data-end=\"4061\">stable occupancy<\/li>\n<li data-section-id=\"1pmsms6\" data-start=\"4062\" data-end=\"4089\">strong pricing resilience<\/li>\n<\/ul>\n<p data-start=\"4091\" data-end=\"4103\"><strong data-start=\"4091\" data-end=\"4103\">Tay Ninh<\/strong><\/p>\n<ul data-start=\"4105\" data-end=\"4166\">\n<li data-section-id=\"1ytjlml\" data-start=\"4105\" data-end=\"4127\">faster supply growth<\/li>\n<li data-section-id=\"1icxbny\" data-start=\"4128\" data-end=\"4166\">more competitive pricing adjustments<\/li>\n<\/ul>\n<h2 data-section-id=\"2syt4n\" data-start=\"4168\" data-end=\"4212\"><span class=\"ez-toc-section\" id=\"Ready-Built_Factories_Are_Growing_Rapidly\"><\/span>Ready-Built Factories Are Growing Rapidly<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"4214\" data-end=\"4222\">Q1 2026:<\/p>\n<p data-start=\"4224\" data-end=\"4249\"><strong data-start=\"4224\" data-end=\"4249\">Total regional supply<\/strong><\/p>\n<ul data-start=\"4251\" data-end=\"4285\">\n<li data-section-id=\"1rjproe\" data-start=\"4251\" data-end=\"4285\">approximately <strong data-start=\"4267\" data-end=\"4285\">6.8 million m\u00b2<\/strong><\/li>\n<\/ul>\n<p data-start=\"4287\" data-end=\"4301\"><strong data-start=\"4287\" data-end=\"4301\">New supply<\/strong><\/p>\n<ul data-start=\"4303\" data-end=\"4333\">\n<li data-section-id=\"6g2oj8\" data-start=\"4303\" data-end=\"4333\">approximately <strong data-start=\"4319\" data-end=\"4333\">192,000 m\u00b2<\/strong><\/li>\n<\/ul>\n<p data-start=\"4335\" data-end=\"4353\"><strong data-start=\"4335\" data-end=\"4353\">Net absorption<\/strong><\/p>\n<ul data-start=\"4355\" data-end=\"4376\">\n<li data-section-id=\"1qxt383\" data-start=\"4355\" data-end=\"4376\">over <strong data-start=\"4362\" data-end=\"4376\">170,000 m\u00b2<\/strong><\/li>\n<\/ul>\n<h3 data-section-id=\"7si0cd\" data-start=\"4378\" data-end=\"4396\"><span class=\"ez-toc-section\" id=\"Dong_Nai_Leads\"><\/span>Dong Nai Leads<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"4398\" data-end=\"4408\">Occupancy:<\/p>\n<ul data-start=\"4410\" data-end=\"4426\">\n<li data-section-id=\"12kbfu4\" data-start=\"4410\" data-end=\"4426\">nearly <strong data-start=\"4419\" data-end=\"4426\">95%<\/strong><\/li>\n<\/ul>\n<p data-start=\"4428\" data-end=\"4453\">Many factory clusters in:<\/p>\n<ul data-start=\"4455\" data-end=\"4478\">\n<li data-section-id=\"7ct32q\" data-start=\"4455\" data-end=\"4467\">Binh Duong<\/li>\n<li data-section-id=\"1f5ur64\" data-start=\"4468\" data-end=\"4478\">Dong Nai<\/li>\n<\/ul>\n<p data-start=\"4480\" data-end=\"4501\">have already reached:<\/p>\n<ul data-start=\"4503\" data-end=\"4523\">\n<li data-section-id=\"8utx8j\" data-start=\"4503\" data-end=\"4523\"><strong data-start=\"4505\" data-end=\"4523\">100% occupancy<\/strong><\/li>\n<\/ul>\n<p data-start=\"4525\" data-end=\"4558\">This reflects strong real demand.<\/p>\n<h2 data-section-id=\"w41bsi\" data-start=\"4560\" data-end=\"4609\"><span class=\"ez-toc-section\" id=\"Southern_Warehousing_Market_Near_Full_Capacity\"><\/span>Southern Warehousing Market Near Full Capacity<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"4611\" data-end=\"4675\">The ready-built warehouse segment continues performing strongly.<\/p>\n<p data-start=\"4677\" data-end=\"4685\">Q1 2026:<\/p>\n<p data-start=\"4687\" data-end=\"4703\"><strong data-start=\"4687\" data-end=\"4703\">Total supply<\/strong><\/p>\n<ul data-start=\"4705\" data-end=\"4739\">\n<li data-section-id=\"nrvma8\" data-start=\"4705\" data-end=\"4739\">approximately <strong data-start=\"4721\" data-end=\"4739\">6.6 million m\u00b2<\/strong><\/li>\n<\/ul>\n<p data-start=\"4741\" data-end=\"4759\"><strong data-start=\"4741\" data-end=\"4759\">Net absorption<\/strong><\/p>\n<ul data-start=\"4761\" data-end=\"4781\">\n<li data-section-id=\"18x2pt2\" data-start=\"4761\" data-end=\"4781\">over <strong data-start=\"4768\" data-end=\"4781\">65,000 m\u00b2<\/strong><\/li>\n<\/ul>\n<p data-start=\"4783\" data-end=\"4801\"><strong data-start=\"4783\" data-end=\"4801\">Occupancy rate<\/strong><\/p>\n<ul data-start=\"4803\" data-end=\"4814\">\n<li data-section-id=\"1gze5ek\" data-start=\"4803\" data-end=\"4814\"><strong data-start=\"4805\" data-end=\"4814\">91.7%<\/strong><\/li>\n<\/ul>\n<h3 data-section-id=\"m4xjfn\" data-start=\"4816\" data-end=\"4858\"><span class=\"ez-toc-section\" id=\"Ho_Chi_Minh_City_Nearly_Fully_Occupied\"><\/span>Ho Chi Minh City Nearly Fully Occupied<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"4860\" data-end=\"4870\">Occupancy:<\/p>\n<ul data-start=\"4872\" data-end=\"4895\">\n<li data-section-id=\"1h5s96w\" data-start=\"4872\" data-end=\"4895\">approximately <strong data-start=\"4888\" data-end=\"4895\">99%<\/strong><\/li>\n<\/ul>\n<p data-start=\"4897\" data-end=\"4949\">As a result, demand is increasingly shifting toward:<\/p>\n<ul data-start=\"4951\" data-end=\"4972\">\n<li data-section-id=\"1f5ur64\" data-start=\"4951\" data-end=\"4961\">Dong Nai<\/li>\n<li data-section-id=\"o7dmit\" data-start=\"4962\" data-end=\"4972\">Tay Ninh<\/li>\n<\/ul>\n<h2 data-section-id=\"u1bzwd\" data-start=\"4974\" data-end=\"4997\"><span class=\"ez-toc-section\" id=\"Current_Rental_Rates\"><\/span>Current Rental Rates<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 data-section-id=\"zd1h10\" data-start=\"4999\" data-end=\"5024\"><span class=\"ez-toc-section\" id=\"Ready-Built_Factories\"><\/span>Ready-Built Factories<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"5026\" data-end=\"5046\">Average lease rates:<\/p>\n<ul data-start=\"5048\" data-end=\"5070\">\n<li data-section-id=\"18m9aue\" data-start=\"5048\" data-end=\"5070\"><strong data-start=\"5050\" data-end=\"5070\">USD 4.9\/m\u00b2\/month<\/strong><\/li>\n<\/ul>\n<p data-start=\"5072\" data-end=\"5086\">Projects with:<\/p>\n<ul data-start=\"5088\" data-end=\"5152\">\n<li data-section-id=\"zkc611\" data-start=\"5088\" data-end=\"5105\">prime locations<\/li>\n<li data-section-id=\"suq3oz\" data-start=\"5106\" data-end=\"5135\">high construction standards<\/li>\n<li data-section-id=\"1oxbdac\" data-start=\"5136\" data-end=\"5152\">ESG compliance<\/li>\n<\/ul>\n<p data-start=\"5154\" data-end=\"5192\">continue showing strong pricing power.<\/p>\n<h3 data-section-id=\"1mtujn4\" data-start=\"5194\" data-end=\"5220\"><span class=\"ez-toc-section\" id=\"Ready-Built_Warehouses\"><\/span>Ready-Built Warehouses<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"5222\" data-end=\"5242\">Average lease rates:<\/p>\n<ul data-start=\"5244\" data-end=\"5280\">\n<li data-section-id=\"6q8yrw\" data-start=\"5244\" data-end=\"5280\">approximately <strong data-start=\"5260\" data-end=\"5280\">USD 4.6\/m\u00b2\/month<\/strong><\/li>\n<\/ul>\n<p data-start=\"5282\" data-end=\"5296\">Interestingly:<\/p>\n<ul data-start=\"5298\" data-end=\"5319\">\n<li data-section-id=\"1f5ur64\" data-start=\"5298\" data-end=\"5308\">Dong Nai<\/li>\n<li data-section-id=\"o7dmit\" data-start=\"5309\" data-end=\"5319\">Tay Ninh<\/li>\n<\/ul>\n<p data-start=\"5321\" data-end=\"5403\">currently record higher rates than Ho Chi Minh City due to newer premium projects.<\/p>\n<h2 data-section-id=\"tm9yml\" data-start=\"5405\" data-end=\"5442\"><span class=\"ez-toc-section\" id=\"ESG_Is_Becoming_a_Core_Requirement\"><\/span>ESG Is Becoming a Core Requirement<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"5444\" data-end=\"5517\">The new generation of industrial parks no longer competes on price alone.<\/p>\n<p data-start=\"5519\" data-end=\"5547\">Emerging priorities include:<\/p>\n<ul data-start=\"5549\" data-end=\"5665\">\n<li data-section-id=\"1pa1z2n\" data-start=\"5549\" data-end=\"5573\">green industrial parks<\/li>\n<li data-section-id=\"rvr4sr\" data-start=\"5574\" data-end=\"5592\">renewable energy<\/li>\n<li data-section-id=\"kvlaiq\" data-start=\"5593\" data-end=\"5616\">rooftop solar systems<\/li>\n<li data-section-id=\"544grb\" data-start=\"5617\" data-end=\"5629\">automation<\/li>\n<li data-section-id=\"147lcaf\" data-start=\"5630\" data-end=\"5646\">ESG governance<\/li>\n<li data-section-id=\"jqtmma\" data-start=\"5647\" data-end=\"5665\">carbon reduction<\/li>\n<\/ul>\n<p data-start=\"5667\" data-end=\"5735\">ESG-compliant projects will enjoy stronger appeal to global tenants.<\/p>\n<h2 data-section-id=\"13rekje\" data-start=\"5737\" data-end=\"5781\"><span class=\"ez-toc-section\" id=\"Who_Benefits_Most_from_This_Growth_Cycle\"><\/span>Who Benefits Most from This Growth Cycle?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 data-section-id=\"8feeq4\" data-start=\"5783\" data-end=\"5813\"><span class=\"ez-toc-section\" id=\"Industrial_Park_Developers\"><\/span>Industrial Park Developers<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"5815\" data-end=\"5825\">Driven by:<\/p>\n<ul data-start=\"5827\" data-end=\"5899\">\n<li data-section-id=\"1lt9ekw\" data-start=\"5827\" data-end=\"5852\">stronger leasing demand<\/li>\n<li data-section-id=\"1qr7qfo\" data-start=\"5853\" data-end=\"5875\">stable rental growth<\/li>\n<li data-section-id=\"1927c00\" data-start=\"5876\" data-end=\"5899\">continued FDI inflows<\/li>\n<\/ul>\n<h3 data-section-id=\"ccuqme\" data-start=\"5901\" data-end=\"5924\"><span class=\"ez-toc-section\" id=\"Logistics_Operators\"><\/span>Logistics Operators<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"5926\" data-end=\"5942\">Benefiting from:<\/p>\n<ul data-start=\"5944\" data-end=\"6013\">\n<li data-section-id=\"h0l8fo\" data-start=\"5944\" data-end=\"5965\">warehouse expansion<\/li>\n<li data-section-id=\"sojmvg\" data-start=\"5966\" data-end=\"5985\">e-commerce growth<\/li>\n<li data-section-id=\"h819tl\" data-start=\"5986\" data-end=\"6013\">last-mile delivery demand<\/li>\n<\/ul>\n<h3 data-section-id=\"qexo2c\" data-start=\"6015\" data-end=\"6051\"><span class=\"ez-toc-section\" id=\"Industrial_Real_Estate_Investors\"><\/span>Industrial Real Estate Investors<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p data-start=\"6053\" data-end=\"6066\">Gaining from:<\/p>\n<ul data-start=\"6068\" data-end=\"6134\">\n<li data-section-id=\"1gqhxqg\" data-start=\"6068\" data-end=\"6089\">rising asset values<\/li>\n<li data-section-id=\"14kr7a1\" data-start=\"6090\" data-end=\"6106\">high occupancy<\/li>\n<li data-section-id=\"11nb47a\" data-start=\"6107\" data-end=\"6134\">sustainable tenant demand<\/li>\n<\/ul>\n<h2 data-section-id=\"1c7pltx\" data-start=\"6136\" data-end=\"6156\"><span class=\"ez-toc-section\" id=\"Long-Term_Outlook\"><\/span>Long-Term Outlook<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"6158\" data-end=\"6197\">Southern Vietnam is expected to remain:<\/p>\n<ul data-start=\"6199\" data-end=\"6344\">\n<li data-section-id=\"xea95t\" data-start=\"6199\" data-end=\"6237\">Vietnam\u2019s largest manufacturing base<\/li>\n<li data-section-id=\"1hgv6wp\" data-start=\"6238\" data-end=\"6268\">a strategic logistics center<\/li>\n<li data-section-id=\"1ghi6ka\" data-start=\"6269\" data-end=\"6304\">a key international trade gateway<\/li>\n<li data-section-id=\"13lvmdj\" data-start=\"6305\" data-end=\"6344\">a major destination for high-tech FDI<\/li>\n<\/ul>\n<p data-start=\"6346\" data-end=\"6361\">Growth drivers:<\/p>\n<ul data-start=\"6363\" data-end=\"6471\">\n<li data-section-id=\"pm94dc\" data-start=\"6363\" data-end=\"6397\">Long Thanh International Airport<\/li>\n<li data-section-id=\"3wyfxe\" data-start=\"6398\" data-end=\"6412\">Cai Mep Port<\/li>\n<li data-section-id=\"gu3bwk\" data-start=\"6413\" data-end=\"6435\">expressway expansion<\/li>\n<li data-section-id=\"1f587yy\" data-start=\"6436\" data-end=\"6471\">global supply chain restructuring<\/li>\n<\/ul>\n<h2 data-section-id=\"8dtpi\" data-start=\"6473\" data-end=\"6486\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"6488\" data-end=\"6727\">The addition of more than <strong data-start=\"6514\" data-end=\"6551\">5,300 hectares of industrial land<\/strong> and <strong data-start=\"6556\" data-end=\"6620\">1.6 million square meters of new factory and warehouse space<\/strong> signals the beginning of a powerful growth cycle for <strong data-start=\"6674\" data-end=\"6726\">Southern Vietnam\u2019s industrial real estate market<\/strong>.<\/p>\n<p data-start=\"6729\" data-end=\"6924\">With high-quality FDI accelerating and regional infrastructure rapidly expanding, Southern Vietnam will remain the country\u2019s most important industrial and logistics growth engine for years ahead.<\/p>\n<p data-start=\"5726\" data-end=\"5748\"><strong data-start=\"5726\" data-end=\"5746\">References:<\/strong><\/p>\n<ul data-start=\"5749\" data-end=\"5903\">\n<li data-section-id=\"qg9xo1\" data-start=\"5749\" data-end=\"5815\">\n<p data-start=\"5751\" data-end=\"5815\"><a class=\"decorated-link\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_new\" rel=\"noopener\" data-start=\"5751\" data-end=\"5813\">Dat Khu C\u00f4ng Nghi\u1ec7p 247<\/a><\/p>\n<\/li>\n<\/ul>\n<h1><span class=\"ez-toc-section\" id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><strong>Free access to exclusive information on warehouse, factory, and land rentals in Dong Nai, Binh Duong, Long An, Ho Chi Minh City, and more.<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p><a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_blank\" rel=\"noopener\"><strong>KHU C\u00d4NG NGHI\u1ec6P 247\u00a0<\/strong><\/a>is a company operating in the field of buying, selling, and leasing factories and real estate<strong>.<\/strong>.\u00a0<a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_blank\" rel=\"noopener\">We<\/a>\u00a0are proud to be a leading provider of real estate services in Vietnam. We have a team of highly qualified and experienced real estate consultants who always place trust and credibility at the core of everything we do<a href=\"https:\/\/jsc-vietnam.com\/khu-che-xuat-la-gi-vai-tro-va-loi-ich\/\" target=\"_blank\" rel=\"noopener\">.<\/a><\/p>\n<p><strong>Phone:<\/strong>\u00a0<strong>0901 490 348<\/strong><\/p>\n<p><strong>Email:\u00a0<\/strong>datkhucongnghiep247@gmail.com<\/p>\n<p><strong>Website:\u00a0<\/strong><a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_blank\" rel=\"noopener\">datkhucongnghiep247.com.vn<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Southern Vietnam\u2019s industrial real estate market is entering a new growth cycle as the region prepares to welcome more than 5,300 hectares of new industrial land and approximately 1.6 million square meters of ready-built factories and warehouses between 2026 and 2029. As high-quality FDI capital continues flowing into Vietnam, Southern Vietnam is expected to strengthen [&#8230;]\n","protected":false},"author":12,"featured_media":6436,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_focus_keyword":"Industrial Real Estate,Southern","rank_math_title":"","rank_math_description":""},"categories":[1],"tags":[],"class_list":["post-6435","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"_links":{"self":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts\/6435","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/comments?post=6435"}],"version-history":[{"count":1,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts\/6435\/revisions"}],"predecessor-version":[{"id":6437,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/posts\/6435\/revisions\/6437"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/media\/6436"}],"wp:attachment":[{"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/media?parent=6435"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/categories?post=6435"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/industrialland.com.vn\/en\/wp-json\/wp\/v2\/tags?post=6435"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}